Turboliner 200

The locomotives have a 6 MJ crash energy absorbance structure; the carbody is stainless steel. [3] The electrical traction system is directly derived from the system used on Alstom 's BB 36000 Astride locomotives; [4] this includes four three phase asynchronous traction motors powered by GTO based inverters, with one inverter per motor; the electric system also allows regenerative and rheostatic braking. [3] The locomotives were designed for up to 217 km/h (135 mph) operation but are actually limited in service to FRA Tier 1 standards, operating up to 201 km/h (125 mph). [3] [5]

China also purchased a X 2000 train named "Xinshisu" (New Speed). The train served as Guangzhou-Kowloon Through Train on the Guangshen Railway from 1998 until 2007. It was delivered to Sichuan Province in August 2007 when it was replaced by an CRH1A . However, due to the 2008 Sichuan earthquake , Chengdu Railway Bureau needed to rebuild the railway networks in Sichuan Province. Also, the authority could not carry the maintenance costs of the train. It was therefore returned to Guangshen Railway Company in late December 2008. In 2012 the train was purchased by SJ and was shipped back to Sweden.

Turboliner 200

turboliner 200

Media:

turboliner 200turboliner 200turboliner 200turboliner 200turboliner 200

http://buy-steroids.org